
Professional Workbench: Hanging Cabinet — Malaysia
Manufactured in Taiwan by Tanko · Malaysia stock · nationwide delivery. Not all combinations are stocked — request a quote to confirm lead time.
-

Workbench-top
Wood top, laminate top and rubber top.
-

Hanging cabinet
45kg load capacity per drawer.
-

600kg load capacity
-

Perforated boards
-

Shelf
-

Universal socket
-

LED Light
-

Transparent front window
-

With divider
-

Anti-static mat
Anti-static mat is optional, includes 2 snaps and 1 grounding wire. RoHS 2.0 compliant Surface resistance: 10⁷ – 10⁹ Ω
-
Step 01Step.1
Workbench-Top
-
Step 02Wood top(W)
Finger-jointed rubber wood to ensure high durability. Features:High temperature resistance, grease and chemical resistance. Tool makers, equipment maintenance.
-
Step 03Rubber top(N)
High density fiberboard(HDF) covered with green rubber mat on top and PVC protection on four edges. Features:High impact strength. Machine maintenance, normal factories, production line and garages.
-
Step 04Laminate top(F)
Plywood top covered with gray laminate and PVC protective edges, great performance in high temperature environment. All electronics companies, research labs, hospitals, workshop and metrology department.
-
Step 05Step.2
Drawer/Cabinet
-
Step 06Step.3
Panel Set
-
Step 07Step.4
Accessories
DIY product, Made in Taiwan
Model No.WBS-63022□
- □ : Workbench-Top → WBS-63022N
- Rubber top(N), Laminate top(F)
- Rubber wood top(W)

Model No.WBS-63022□
- Workbench-topN / F / W
- DimensionsW1800xD750xH800mm
- MaterialSteel

Model No.WBS-63022□2
- Workbench-topN / F / W
- DimensionsW1800xD750xH1400mm
- MaterialSteel
- Panel SetPerforated Board

Model No.WBS-63022□3
- Workbench-topN / F / W
- DimensionsW1800xD750xH1400mm
- MaterialSteel
- Panel SetPerforated Board+Shelf

Model No.WBS-63022□4A
- Workbench-topN / F / W
- DimensionsW1800xD750xH1400mm
- MaterialSteel
- Panel SetPerforated Board+ Socket ※ Power plugs not included

Model No.WBS-63022□5A
- Workbench-topN / F / W
- DimensionsW1800xD750xH1400mm
- MaterialSteel
- Panel SetPerforated Board+ Shelf+Socket ※ Power plugs not included

Model No.WBS-63022□6A
- Workbench-topN / F / W
- DimensionsW1800xD750xH1400mm
- MaterialSteel
- Panel SetPerforated Board+ Shelf+Socket ※ Power plugs not included

Model No.WBS-63022□7A
- Workbench-topN / F / W
- DimensionsW1800xD750xH1365mm
- MaterialSteel
- Panel SetParts Cabinet Socket+Light ※ Power plugs not included
21 configurations. Every variant below has its own detail page.
| Model | Dimensions | Top | Panel set | |
|---|---|---|---|---|
| WBS-63022F | W1800xD750xH800mm | Laminate top(F) | None | Details → |
| WBS-63022F2 | W1800xD750xH800mm | Laminate top(F) | Perforated board | Details → |
| WBS-63022F3 | W1800xD750xH800mm | Laminate top(F) | Perforated board+Shelf | Details → |
| WBS-63022F4A | W1800xD750xH800mm | Laminate top(F) | Perforated board+Socket | Details → |
| WBS-63022F5A | W1800xD750xH800mm | Laminate top(F) | Perforated board+Shelf+Socket | Details → |
| WBS-63022F6A | W1800xD750xH800mm | Laminate top(F) | Perforated board+Shelf+Socket+Light | Details → |
| WBS-63022F7A | W1800xD750xH800mm | Laminate top(F) | Parts cabinet+Socket+Light | Details → |
| WBS-63022N | W1800xD750xH800mm | Rubber top(N) | None | Details → |
| WBS-63022N2 | W1800xD750xH800mm | Rubber top(N) | Perforated board | Details → |
| WBS-63022N3 | W1800xD750xH800mm | Rubber top(N) | Perforated board+Shelf | Details → |
| WBS-63022N4A | W1800xD750xH800mm | Rubber top(N) | Perforated board+Socket | Details → |
| WBS-63022N5A | W1800xD750xH800mm | Rubber top(N) | Perforated board+Shelf+Socket | Details → |
| WBS-63022N6A | W1800xD750xH800mm | Rubber top(N) | Perforated board+Shelf+Socket+Light | Details → |
| WBS-63022N7A | W1800xD750xH800mm | Rubber top(N) | Parts cabinet+Socket+Light | Details → |
| WBS-63022W | W1800xD750xH800mm | Wood top(W) | None | Details → |
| WBS-63022W2 | W1800xD750xH800mm | Wood top(W) | Perforated board | Details → |
| WBS-63022W3 | W1800xD750xH800mm | Wood top(W) | Perforated board+Shelf | Details → |
| WBS-63022W4A | W1800xD750xH800mm | Wood top(W) | Perforated board+Socket | Details → |
| WBS-63022W5A | W1800xD750xH800mm | Wood top(W) | Perforated board+Shelf+Socket | Details → |
| WBS-63022W6A | W1800xD750xH800mm | Wood top(W) | Perforated board+Shelf+Socket+Light | Details → |
| WBS-63022W7A | W1800xD750xH800mm | Wood top(W) | Parts cabinet+Socket+Light | Details → |